This 2021-built property sits on 111.12 acres of land and is a 1,400,580-SF distribution center featuring 36 feet of clear height, 200 car parking stalls and 555 trailer parking stalls, and 246 docks with full cross-docking configuration. The asset is located in the town of Duncan, South Carolina and is 16 miles from downtown Greenville. It is adjacent to Inland Port Greer, the BMW manufacturing center, and Greenville Spartanburg International Airport (GSP). The Property is 100% long-term leased to Techtronic, an investment grade multinational company that designs and manufactures power tools, electronic equipment, and floor care products. This project has an absolute NNN lease with very limited landlord capex exposure.